Project Management

Assignment 1
In this assignment, we were required to form a group and work with different role like architect, QS, interior designer, project manager and so on in order to finish a task together, just like what those professionals do in daily life. I, as a role of architect, basically work on designing part and discuss with the other group mates about design changing in every meeting. The meeting held once a week and each member must participate in order to catch up with update detail. During the meeting, there will be a meeting head to control the overall meeting and the rest would give their opinions.

There are lots of changes here and there in the assignment, as my design would need to be checked by the civil engineer and M&E in order to check whether it fulfills the construction requirement. And also, I need to check with the cost whether my design is still within the budget given. For design, I explained further detail with the interior designer and landscape architect. Overall, it was a challenging and fun experience as I had never have this experience before.

Assignment link: https://www.slideshare.net/siewjohnloong/1-finalcompletepm


Assignment 2
In this assignment, we were required to make a report based on our studio design. And also, we need to put in analysis like gannt chart. The assignment was clear and simple to be done.

Link: https://www.slideshare.net/siewjohnloong/pm-project-2