Building Science 2

Project 1 Performance Evaluation (Group)


In a group of six members, we were required to choose a building in order to assign with our first project where to observe and to analyse the report on the lighting and acoustics performance based on the selected building. We have chosen the Garage 51 in Bandar Sunway as our selective building as it is located nearby our university and it involves the both elements that we wanted to study. During the building visiting, we have measured the overall building  and include all the necessary features which effect on the lighting and acoustics to the selected building. Through the specific tools, we have carried out some analysis based on day lighting, artificial lighting, noise and sound condition. From the assignment, I have learnt on how to explore and apply the understanding of building physics which are lighting layout arrangement and acoustics design  based on certain method and calculation. Each of our member are responsible in each part of the report where some of them focus on calculation, research, diagrams and precedent studies to complete the assignment well.

And also, we have finished a report on lighting and acoustics analysis based on Garage 51 building with 2 A3 size summary board for each topic.






Summary Boards

Complete group report
http://www.slideshare.net/crysmondgoh/report-bscience-2-evaluation-performance-lighting-acoustics






Project 2: Integration (Individual)

In this project, we are required to to choose 2 significant spaces for the final design of our studio building by implementing lighting artificial and day-lighting strategies (PSALI) to produce a detailed report with 2 A2 size boards by doing diagrams. Calculation is also part of the requirement. From this project, I have learnt on how to solve the design problem regarding to artificial lighting and day lighting issues.   







Complete report:
http://www.slideshare.net/siewjohnloong/final-building-science-report





No comments:

Post a Comment